SILLY-LE-LONG (60), construction project for a logistics platform with a total surface area of approximately 37,500 m².
This platform is part of an approach to architectural integration into its landscape environment This platform is part of an approach to integrate architecture into its landscape environment and to seek an "eco-responsible" building.
It will therefore benefit from all the standards of the latest generation of buildings. BREEAM VERY GOOD environmental certification and a photovoltaic roof will complete the package.
The project will be integrated into a ZAC (mixed development zone) currently being developed by the Pays de Valois Agglomeration Community, which has ambitions for high-end developments for this future ZAC.
Features
Frost-free heating (+5°C to -7°C) Docks equipped with autodocks ICPE classifications: NC Height : 11 m Ground level access : 2 Dockside access : 35 Floor load : 5 t/m² Sprinkler Hose station Heavy traffic