Appelez-nous
+39 02 80 29 21Écrivez-nous
logistics@dils.comSite web
eu-central-1.protection.sophos.comPour plus d'informations, remplissez le formulaire ci-dessous et nous vous contacterons.
Located in Calvenzano, in the province of Bergamo, the project develops along the BreBeMi corridor, near the main connecting routes of Northern Italy. The position favors integration with the main distribution flows and ensures efficient access to target markets.
Currently under construction, the complex is designed to meet the needs of contemporary logistics, with spaces and technical facilities designed to support storage and goods handling activities. The property's configuration aims to combine operational functionality and efficiency in managing logistics flows.
The project is situated in an area of interest for the sector, enhanced by its proximity to the infrastructure network and its position along one of the main connecting axes between Eastern Lombardy and the national distribution system.
| Typologie | Logistique grande boîte |
| Pré-certification | Oui |
| Certifications | BREEAM Excellent |
| Surface du terrain | 114.000 m² |
| Hauteur sous poutre | 12,50 m |
| Système d'arrosage | NFPA ESFR |
| Quais de chargement | 58 |
| Portes industrielles de plain-pied | 2 |
| Structure REI | 120 |
| Capacité du sol de chargement | 5 t/m² |
| Nom | Zones d'entrepôt | Zones de bureaux |
|---|---|---|
| Surface | 52.000 m² | 2.500 m² |